Road Surface Repairs at Lakeshore Drive and Parmenter Road
The Ministry of Transportation will be on site Friday, March 25, 2022, weather permitting, to begin temporary road surface repairs along Columbia Valley Highway following the damages sustained during the 2021 flooding events.
Traffic control and paving contractors will be stationed at various locations including Parmenter Road and Lakeshore Drive to assist in guiding residents and guests safely through the area while work is being completed.
Following the 2022 summer season, the Ministry of Transportation will begin to address the required culvert repairs in this specific area.
We appreciate your patience and cooperation at this time.